Severity: Warning
Message: mysqli::real_connect(): Headers and client library minor version mismatch. Headers:100618 Library:100505
Filename: mysqli/mysqli_driver.php
Line Number: 201
Backtrace:
File: /home/ceehokvf/public_html/ci_app/third_party/MX/Loader.php
Line: 109
Function: DB
File: /home/ceehokvf/public_html/ci_app/third_party/MX/Loader.php
Line: 65
Function: initialize
File: /home/ceehokvf/public_html/ci_app/third_party/MX/Base.php
Line: 55
Function: __construct
File: /home/ceehokvf/public_html/ci_app/third_party/MX/Base.php
Line: 60
Function: __construct
File: /home/ceehokvf/public_html/ci_app/third_party/MX/Controller.php
Line: 4
Function: require
File: /home/ceehokvf/public_html/ci_app/core/MY_Controller.php
Line: 4
Function: require
File: /home/ceehokvf/public_html/index.php
Line: 322
Function: require_once
Unimed Building is a eight stories high building, offering large open space for the office environment; flexible, according to the client's requirements. The property consists of a total 8350 sqm, including underground (P), ground floor with a gallery and seven upper floors. Located in the heart of Bucharest, this modern office building is situated on No. 8-10 Tudor Arghezi St. close by the major traffic crossroad, Piata Universitatii, in the most lucrative downtown location.
The architecture of this construction perfectly fits the new future image of the modernized downtown area, adjacent to monumental buildings of the Romanian capital.
Property details: |
|
✔Elegant public areas, open space office floors ,
✔Fully equipped kitchens.
✔Choice of carpet or granite porcelain tiles
✔Two Schindler Elevators
✔ 24 Hours Security and security surveillance.
✔Receptionist and electronic tourniquets
✔Facility management 7 days a week
✔All tenants are first class multinational firms.
✔ Microsoft, Goethe Institute, INC Research, OVE Arup, Verbund.
✔The building offers effective constructive innovating solutions and it is made of new and
performant materials. It provides all the needed services in a business environment.
✔The underground parking has a capacity of 60 vehicles. The cars are superposed using
equipment provided by Klaus Gmbh, the European leader in multi-level parking
system.
✔In the rear of the building there are another parking places for 13 cars.
✔The parking is controlled 24 hours a day by electronic security system as well as by guards
and the main car entrance is accessed by remote control.
✔Tremendous efforts have been made to provide the building with windows that are made of double glazed sound-proof glass.
✔The building has independent electric energy supplies, to prevent power failures; so that eventually breakdowns of city electric system cannot affect it.
✔The building is entirely air-conditioned. Efficient system of central heating is provided by a world leading manufacturer.
✔The satellite, broadband, phone and cable TV infrastructure is one of the build-in features of the construction.
▪ The building has an underground floor, seven upper floors and a gallery between ground floor and first floor.
▪ The 6th and 7th floors are not as large as the other floors as the façade was a little withdrawn to observe/indulge aesthetic and environmental requirements.
▪ Every floor has independent bathrooms and kitchenette facilities.